RE: Road Safety Audit Reports for the Highways Scheme at the A1 Grantham (Southern Relief Road) as Required by GG 119
With reference to the suite of documents that form the Design Manual for Roads and Bridges as listed in GG 000, as explained in GG 101, as also stated to be carried out by Competent Practitioners, and as applicably set out in GG 119 section 1 and 2, please provide for the 4 stages set out in section 7 of GG 119 (note Ref: 3.N section 7 GG 119) :-
1) a complete copy of the Road Safety Audits Reports required for the A1 Grantham Highway Scheme (that includes Traffic Safety Measures and Signs for Road Works and Temporary Situations!!), for the Southbound Highway north of Dysart Road overbridge to the South at Little Pontin, and
2) for the Northbound Highway for the similar extents.
- Decision
-
A copy of the Road Safety Audit (combined Stage 1 and Stage 2) is attached.
If you would like to see a copy of this attachment, please contact CustomerInformationService@lincolnshire.gov.uk quoting the reference number 3120825.
- Reference number
- 3120825
- Date request received
- 04 January 2022
- Date of decision
- 25 January 2022